banner ad
blog post banner

Kerakoll goes green in Principal London Hotel transformation

October 2018

When the historic Russell Hotel was refurbished before reopening as the Principal London Hotel in spring 2018, the tiling contractor - Chiltern Contracts -  specified Kerakoll products for their “ease of use and eco credentials”.

A total of 338 guest bathrooms, designed by Tara Bernerd & Partners, were tiled: Calacatta Cremo marble was used for all floors and skirtings in both mosaics and larger tiles, while the walls were covered in a mixture of crackle glazed Metro tiles and Calacatta Cremo

Time was a factor on parts of this project, so Kerakoll UK recommended the use of some of the company’s fast track products: Keracem Eco, a screed that supports foot traffic after 8 hours and can be tiled after 24 hours in standard conditions; Biogel Revolution, the rapid-set version of the Biogel range that is ready for foot-traffic and grouting on floors after 3 hours and grouting on walls after 2 hours; and Fugabella Eco Flex which is also rapid setting as well as having a high degree of flexibility.

In areas where the work was not so time-critical Biogel No Limits, the standard set version of the range, was used with Fugabella Eco Porcelana 0-5.  Fugabella Silicone was used as a sealant throughout.

More at: www.kerakoll.co.uk 

Wincanton wins Training Team of the Year at Talent in Logistics Awards 2018

Wincanton’s Health, Safety, Driver Training & Development Team was named Training Team of the Year at the Talent in Logistics...

Continue Reading

Cosentino launches 13th Cosentino Design Challenge

The Cosentino Group has announced the launch of the 13th edition of the Cosentino Design Challenge.  Open internationally, this competition...

Continue Reading

London Festival of Architecture takes in Royal Wharf

Royal Wharf, Ballymore & Oxley’s flagship development in London’s Royal Docks, will join the capital’s finest architectural plans, projects and...

Continue Reading